From an operations perspective, the most interesting passenger service at the P&LE Pittsburgh terminal in 1949 was the joint operation of the B&O’s Washingtonian and the P&LE’s Steel King, running between Baltimore and Cleveland in two hours and forty minutes, the fastest option at the time. The Steel King operated on the segment west of Pittsburgh, and the Washingtonian operated on the segment east of Pittsburgh. When arriving in Pittsburgh, incoming trains would hand off their last two cars (an Erie coach and a B&O parlor-dining-lounge car) to the counterpart train for the rest of the run, with about 30-40 minutes between the arrival of the inbound and the departure of the outbound.
The Steel King was itself a joint operation with the Erie Railroad, which contributed half the motive power and one coach. The train was pulled on alternating days by either Erie or P&LE locomotives, while the other was serviced in Youngstown between runs. Since the morning arrival and evening departure in Pittsburgh both occur …